BART Misc. Civil Support​​​​​​​

Miscellaneous Internal BART M&E construction projects are part of the measure RR Bond passed by the Tax Payers to improve the BART System. Projects include the System Wide Wayside Safety Barrier Phase 3 installation, System Wide Wayside Signage improvements/replacements, System Wide Station Platform Edge Tile replacements and Slope Stabilization.
Three men working at night on site of a miscellaneous BART civil support projectThree men working at night on site of a miscellaneous BART civil support project
The projects were conducted, generally, during non-revenue hours and during weekend operations shut downs piggy-backing onto the track closures of other projects.  Piggy-backing took lots of look-ahead-planning and coordination.
 
PSM Personnel supported the Civil Engineering group within the M&E division performing construction engineering services and served as a liaison to the Maintenance Division. PSM Personnel coordinated: labor, procuring material, construction estimates, scheduling crews/equipment/track allocation, performing design assessments and scheduling/running coordination meetings.
bart-misc-civil-supp1bart-misc-civil-supp2